Navigation

  • Page 1

    1 Springwood Industrial, Inc. Klim Industrial, Inc. 1062 N. Kraemer Place 244 N. Randolphville Road Anaheim, CA 92806 Piscataway, NJ 08854 Tel: 714-632-9701 Fax: 714-632-9730 Tel: 732-752-9100 Fax: 732-752-9101 http://www.acergroup.com http://www.acergroup.com info@acergroup.com acer_klim...

  • Page 2

    2 2. Push Clamp and Unclamp button. (See Fig. 5) Cylinder will be pushed down, limit switch closed. (See Fig. 6) Air cylinder push down to open spindle collet. (See Fig. 7). Fig. 5 Fig. 6 3. Release Tool Clamping and Unclamping push button. Loosen two lock screws. (See Fig. 8) Adjust cy...

  • Page 3

    3 4. Retighten two locking screws. 5. Testing. Push Clamping and Unclamping button. Insert tool and push up tool against the nose of the spindle. (See Fig. 10) The tool will start to bump up and down. This bumping should be gentle. If too strong of a bumping, then it means that the gap is ...

x