Navigation

  • Page 1

    CNC1315 LATHE OPERATION INSTRUCTION, CERTIFICATE OF INSPECTION AND PACKING LIST Manufacture No.: 12 0 7 3 0 2 MADE IN CHINA

  • Page 2

    .I I . I CONTENTS Operation Instruction l.Safety Messages ......................................................................................... I 2.Points for Attention ..................................................................................... 7 3.Main Specifications and Parameters...

  • Page 3

    I Operation Instruction Total38 Pages Page 1 1.1 The Signs of the Safety Mesage and Their Definitions All the safety articles described in this Operation Instruction are very important, which can ensure you to use the lathe safely, protect you and others around from any injuries, and avoid any da...

  • Page 4

    .I Operation Instruction Total38 Pages Page2 A normal CNC lathe should be connected to a separated earthing pole. If this condition is not provided with in the installation place, it can be prepared according to the follows: (1 ). An individual conductor can be connected to the grounding terminal...

  • Page 5

    Operation Instruction Total38 Pages Page3 (7). All the safety measures on the lathe, such as gro,unding, safety protection, warning system, limit swithces, etc., should be inspected often. If there are any problems, please adjust them in time according to requirements in order to avoid any accide...

  • Page 6

    Operation Instruction Total38 Pages Page4 (3). While closing the protective door of the lathe, mind not to jam your hands; During the automatic processing procedure, it is not permitted to open the protective door. (4). It is not permitted to mount or dismount the cutter while the spindle is runn...

  • Page 7

    Operation Instruction Total38 Pages Page 5 If the chuck of the lathe cannot be used correctly, it would be the main reason to cause the safety problems to the operator or the machine. The points for attention in using the chuck are described in the follows, and the operators should clearly unders...

  • Page 8

    Operation Instruction Total38 Pages Page6 (3). In order to ensure the service life of the slideways, it should be minded to keep the surfaces of the slideways clean and lubricated. Especially in machining the workpieces of cast iron, the chip scrapers on the slideways should be cleaned, often. (4...

  • Page 9

    Operation Instruction Total38 Pages Page? (1). After finishing the maintenance service, the working environment should be cleaned and arranged, and the water, oil or grease on the components and parts should be wiped off, in order to provide a good working environment. (2). All replaced old parts...

  • Page 10

    Operation Instruction Total38 Pages Page 8 When turning off the lathe, a reverse sequence must be followed. 2.5 After turning on the Main Power Switch, must check whether the phase sequence of the power supply is correct or not. As for the detailed methods for the checking, please see Item 13.3. ...

  • Page 11

    Operation Instruction Total38 Pages Page9 This Lathe can carry out the turning jobs of cylinder, cone, multidiameter, end face, boring, grooving, thread cutting, arc surface, and etc. so that it can be comprehensively used in the industries of mechanical instrument, motorcycle, burning devices, l...

  • Page 12

    Operation Instruction Total38 Pages Page 10 I I __....~ Fig.1 Diagram of the Transmission System of the Lathe

  • Page 13

    Operation Instruction Total38 Pages Page 11 The Instruction S value directly indicates the speed value of spindle. After the letter of S, maximally, a 4-digital number can be entered for the practical spindle speed. It is simple and visual in operating. For instance: When selecting 500rpm as the ...

  • Page 14

    Operation Instruction Total38 Pages Page 12 Fig.2 Diagram of Bearings' Positions of the Lathe

  • Page 15

    Operation Instruction Total 38 Pages Page 13 Table 2, Detail List of Rolling Bearings Bearing Bearing Name Quantity Precision Number on Code Class Drawings 7000103 Deep Groove Ball Bearing 2 PO 1 NN3010K Double-Row Cylindrical Roller Bearing 1 P5 2 7012AC Double Direction Angular Contact Thrust 3...

  • Page 16

    Operation Instruction Total38 Pages Page 14 Fig.3 Diagram of Longitudinal Feed Gear

  • Page 17

    Operation Instruction Total38 Pages Page 15 affected. For the bearings on both end bearing brackets of the ball screw, while assembling them, a white special 3# lubricating grease has be applied to ensure the good lubricating capacity during the operating period. So, there is no need to add any m...

  • Page 18

    Operation Instruction Total38 Pages Page 16 Fig.4 Diagram of Cross-Feed Gear

  • Page 19

    i I Operation Instruction Total 3 8 Pages Page 17 I I Fig.5 Diagram of Head Stock Structure

  • Page 20

    Operation Instruction Total38 Pages Page 18 along the bed guide rail. Meanwhile, the tailstock can be fixed on any required position by means of an eccentric mechanism. The offset of tailstock on horizontal surface can be adjusted by means of lateral adjusting screw. 9. The Cooling System of the ...

  • Page 21

    ··' Operation -------~ ;:s 0.. 0.0 I: ·~ 0 ·-.E ;:s ......... 0 -Instruction Total38 Pages Page 19 Fig.6 Schematic Diagram of Locations by Lubricating Pump

  • Page 22

    Operation Instruction Total38 Pages Page 20 11.1 For the power supply of the lathe, AC two-phase four-wire system is adopted. The main parameters of the lathe are as follows: (1). The Rated Voltage: 220V (2). Phase Number: two-Phase (3). Frequency: 50/60Hz (4). The Rated Capacity: 5Kw (5). The Ra...

  • Page 23

    Operation Instruction Total38 Pages Page 21 + . ! i I Fig. 7 Diagram of Operating Positions of the Lathe

  • Page 24

    Operation Instruction Total38 Pages Page22 b. The main drving motor M 1 of the lathe is a Three-phase asynchronous motor of Y1 OOL-4. Rated Power: 2.2 Kw Rated Current: 5A Rated Rotation Speed: 1400 rpm. For the speed regulation of the main driving motor, the frequency conversion is used (refer t...

  • Page 25

    Pages 23 through 38 have been removed from this manual due to necessary updates. This section is unavailable at this time. Please check our website for future updates -they will be posted when they are available. 1/18/2013

  • Page 26

    This is to certify that the lathe is inspected according to the Standards concerned, and qualified in precision. It is, hereby, permitted for delivery. (attached with precision inspection forms) Inspection Director: Y e ti U i General Manager:

  • Page 27

    Precision No. Inspection Items a: Levelling the Lathe b:The straightness of Go Slideway within the vertical plane. The straightness of Slide G1 Carriage moving within the horizontal plane. Run-out at Spindle end a: Axial float of the Spindle. b: Run-out of the supporting surface of the spindle sh...

  • Page 28

    No. I Ga Precision Inspection Items The parallelism of the spindle axis to the motion of the slide carriage. The parallelism of the axis of the tailstock sleeve to the motion of slide carriage. The parallelism of the axis of the taper hole of the tailstock sleeve to the motion of slide carriage. ...

  • Page 29

    -I Precision Inspection Total4 Pages Page 3 t-N&.---lnspe&tien--lte:-JR!:;~~---1----Inspee-tion-Sketeh•---I__AU_owable_error_, ___ _ G1o G11 G12 Parallelism of the movement of tailstock to that of slider. a. within vertical plane; b. within horizontal plane; Torward/reverse backlash of ...

  • Page 30

    Precision Inspection Total 4 Pages Page4 No. Inspection Items Inspection Sketch Allowable error <mm) Pt p2 The accuracy of ~ finishing outside circle: )__ r-a: Cylindricity L2 b: Roundness D=20-45 Ll=lOO Planeness of finishing end face £:; ~ ~ rd' Lmax=30 . Ll -'--L2 0=150 a: At a measuring l...

  • Page 31

    Attachment 1. Test Workpiece Drawing ~·tx112W ·I I 81 cp j I I j I M 60 '0+£6<1> ' r ~ f'. (Y) ) I 0 M 0 0/' ) \ L[) +I co (j)y ' j j' ) (X) (Y) \ I ~ \[) (\J .Ia / "' ~ f".. ....... ~ £Zcv I ~ 0£<D I~ "'--_/ Material: Brass

  • Page 32

    CNC1315 LATHE PACKING LIST Manufacture No.: MADE IN CIDNA

  • Page 33

    Packing List Total 1 Page Packing Dimensions: 170 X 105 X 155 em (L X W X H) G.W.: 1020 Kg N.W.: 920 Kg No. Descriptions Model and Specifications Qty Remarks 1 Main Machine 1 set With its base seat 2 Three-jaw Chuck KZ125 1 set Mounted on machine I -, 3 Tool Carriage 1 set Mounted on the Main Mac...