Navigation

  • Page 1

    Laser engraving machineJinan Ruofen Laser Machinery Co.,LtdWebsite: actionURI(http://www.ruofencnc.com):www.ruofencnc.comService Contact information :Email: actionURI(mailto:service@ruofencnc.com):service@ruofencnc.comSkype:lifancncPlease send us your Order No. , we will do our best service for y...

  • Page 2

    1.去除机器上所有的包装,木箱,薄膜 等 (小心钉子 ,注意安全)Remove all the package recover the machine like the wood ,plastic filmand so on (be careful for the nails )2.打开机器上的大盖,侧门,及前门 ,取出里面的所以发货配件 :冷水机/水...

  • Page 3

    Exhaust fan pipe

  • Page 4

    Air pumpwrenchSoftdogCableChillerWater pump

  • Page 5

    Exhaust fanExhaust fanRotary axisLaser tube

  • Page 6

    3.打开机器前盖,剪掉 x 轴和 y 轴皮带上面的扎带,并取出光盘等,手轻轻移动激光头,移动到台面的中间位置。when you open the front door ,please cut the tie on the belt of the X-axisand Y-axi, get the CD , you can move the laser head to the center of thewo...

  • Page 7

    (2) 激光管上面有出光口和反射端,将出光口靠近第一反光镜(低压端),全反射端在另一头(高压端),全反射端在另一头(高压端)低压线接在激光管出光口这一端,高压线接在全反射端。There is two ends of the laser tube ,one is ...

  • Page 8

    (3) 有保护套的带上保护带,没有保护套的多缠防水高压胶带,激光管出光口是出水口。在上面,激光管全反射端是进水口,在下面,接上硅胶管,原则是低进高出。If it have the plastic protective sleeve , please cover the protective tape ,If ...

  • Page 9

    The installation method of the water chiller / water pump:(1)冷水机 :将冷水机的进/出水口,分别用硅胶管连接在机器上的出/进水口,并且连上航空插头(水保护线)water chiller: you should connect the water inlet and water outlet of waterchiller to the wat...

  • Page 10

    (2)水泵 :将水泵的出水口用硅胶管连接到机器上的进水口,并且用另一根硅胶管直接连接到机器的出水口,一端投入水箱中。water pump : use the silicone tube connect the water outlet of the waterpump with the water inlet of the laser machine . Then u...

  • Page 11

    The installation method of the air pump :Connect the air outlet of the airpump with the air inlet of the laser machine . (Air inlet )7.安装风机 :将风机的抽风口与机器上的伸缩管连接。

  • Page 12

    The installation method of the dust collector : Connect the exhaust port ofthe dust collector with the telescopic pipe of the laser machine .

  • Page 13

    8. 安装地线 :一定要安全接地,找一根线一头连到机器的接地端子,另一头接在钢筋上,埋在地上,钢筋要埋入地面 1.5 米,如果在潮湿的地方,钢筋埋入地面可以浅一些。The installation method of the Ground :must connect the ground securi...

  • Page 14

    9. 重新检查安装的配件是否正确安装,也要检查电源部分,接线头是否有掉落的和碰坏的You should check the parts of the machine is right installation , theElectrical accessories and line is whether drop , damage .10. 机器上要求使用 220v 的电压 ,如当地...

  • Page 15

    First you supply the power to the water chiller ,you should check thesilicone tube what make water , special water flow is whether normal .12. 连接电源 :将正确电压 220v 连到机器上的电源进口,打开急停和电锁,看通电是否正常,都打开后 ,在控制面板上...

  • Page 16

  • Page 17

    13. 将加密狗插到电脑上,并且将光盘里的内容拷贝到电脑上,用蓝色数据线将设备的板卡和电脑连接,给设备通电,正确安装软件。plug the softdog in the computer , copy the data of the CD to thecomputer ,use the blue data cable to connect the computer...

  • Page 18

    14. 打开电脑桌面的 Lasercut 图标,在这区域的任意位置话一个 40*40 圆形,加工方式是切割, 速度是 100 ,功率为 1 ,下载到机器里 , 将激光头移到适当位置,点 TEXT ,看能否正常走边框,如正常,点 START ,开始工作 。Open the Las...

  • Page 19

  • Page 20

  • Abstract

    The installation method of the water chiller / water pump:(1)冷水机 :将冷水机的进/出水口,分别用硅胶管连接在机器上的出/进水口,并且连上航空插头(水保护线)water chiller: you should connect the water inlet and water outlet of waterchiller to the water outlet and water inlet of the machine by the Siliconetube ,then connect the air plugs ALARM OUTLET (water protective )

x